Dhablan 4 line Station Esm Sudesh Helper - Amit Crank Handle zone - 12 Point and Crossing Inspection - East Zone ( PTA side) - Point-13, Track - 21. Inspection done by Incharge- 24 Jan 26 Compliance pending West Zone ( NBA side) - Point 11,Track -20 Inspection done by Incharge on 25 Jan 26 Compliance pending. TRD Inspection- 12 June 25. Dhablan- PTA UP HASSDAC No 1 on Quad and Number 2 on OFC. Self Inspection- 11 Feb 26 Points and Tracks and HASSDAC of PTA side. Deff - 1.GTP insulation of Pt 65 A,64 A,64 B,TP 63, 62 B,61 A to be replaced. 2. Cleaning of ARA terminals inside all Point machines. 3. Cleaning of JB ( L-4) required. Inspection of Nabha Side yard - Point 71 a,70a,70b,71b,72,74 Lc 32 carried out. Deff - L bracket insulation of p 72 and p74 need replacement. Fault of L2 SSDAC If Dn HASSDAC PTA side failed due to train departure, SSDAC of 03 Birthing line fails due to train arrival, UP HASSDAC ...