Daily Routine
31 Jan 26 - Reported at office
01 Feb 26 - PTA
02 Feb 26 - Kli for dual detection up side
03 Feb 26 - PTA Dhablan Quad testing with tele staff
04 Feb 26 - kli for AMC of statcon and westrace EI
05 Feb 26- Doc for dn distant fault,RPJ Office for official work
06 feb 26 - REST.
07 Feb 26 -- Dhablan for Joint Inspection of Gate 34 INTERLOCKING Work.
08 Feb 26 - Inspection of Point Machines of ESM Janrail at PTA.
09 Feb 26 - Inspection of PTA ips and power supply system
10 Feb 26 - Inspection of NBA station
11 Feb 26 - Inspection of Dhablan station
12 Feb 26 - Kli for doc- kli dual check with sse tel rpj incharge
13 Feb 26 - Rest
14 Feb 26 - PTA , AMC of Statcon at gate 19, inspection of Gate 19 and gate 20.
15 Feb 26 - 11:22 hrs passenger train from Pta to Daunklan. DOC for AMC of Westrace, Delton and Statcon.
16 Feb 26 - Doc for shifting of OfC with quad on HASSDAC kli side.insp of pta side points
17 Feb 26 - PTA for planning of Interlocking work of gate 34 and gate 15.
18 Feb 26 - DBN for Dual fault check and SI 3 inspection .
19 Feb 26 - Pta for si3 inspection
20 Feb 26 - KLI for dual fault check and inspection
21 Feb 26- Leave
22 Feb 26 - CR
23 Feb 26 - Klsx for Indication wiring of IPS ok, UP AT ok, DN AT OK.
24 Feb 26 - KLI FOR 59at fault attended, track
25 Feb 26 - SDY for engg block
26 Feb 26 - Leave
27 Feb 26 - Rest
28 Feb 26 - KLI FOR cable shift with telecom
01 Mar 26 - Pta for si3 inspection of track circuits of DBN side.
02 mar 26 - Pta for joint TRD Inspection
03 mar 26 - Klsx for inspection
04 Mar 26 - pta for rolling block preparation
05 Mar26- kli for Westrace AMC
06 Mar 26- Rest
07 Mar 26- CTW for AMC of statcon and AMC of Delton,Fault check of dual Up side unit no 1 ,NBA side.
08 Mar 26-- pta for si3 inspection
09 Mar 26- Doc for AMC visit of Statcon
10 mar 26 - rpj for ips AMC rh2 and drm inspection .
11 Mar 26 - klsx for AMC of Westrace, statcon,Datalogger
12 mar 26 -Rpj office for joint with pway
13 to 17 March - leave
18 march - Kli for ips battery charging and point crossing compliance
19 march - Kli for ips battery charging and point crossing compliance
20 March- Rest
21 march - kli for facs validation
22 march- kli for facs validation
23 March - kli for facs validation and si 3 inspection of DOC side yard.
24 March - kli for battery charging, doc for FACS wiring
Klsx - Emergency point operation pending
Nabha -
Emergency Crank Handle- ECHYZ - 25 .09.25
EMERGENCY POINT OPERATION - 25.09.25
E