Daily Routine

 31 Jan 26 - Reported at office 

01 Feb 26  - PTA

02 Feb 26 - Kli for dual detection up side

03 Feb 26 - PTA Dhablan Quad testing with tele staff

04 Feb 26 - kli for AMC of statcon and westrace EI

05 Feb 26-  Doc for dn distant fault,RPJ Office for official work

06 feb 26 - REST. 

07 Feb 26 -- Dhablan for Joint Inspection of Gate 34 INTERLOCKING Work.

08 Feb 26 - Inspection of Point Machines of ESM Janrail at PTA.

09 Feb 26 - Inspection of PTA ips and power supply system

10 Feb 26 - Inspection of NBA station

11 Feb 26 - Inspection of Dhablan station

12 Feb 26 - Kli for doc- kli dual check with sse tel rpj incharge 

13 Feb 26 -  Rest

14 Feb 26 - PTA , AMC of Statcon at gate 19, inspection of Gate 19 and gate 20.

15 Feb 26 - 11:22 hrs passenger train from Pta to Daunklan. DOC for AMC of Westrace, Delton and Statcon.

16 Feb 26 - Doc for shifting of OfC with quad on HASSDAC kli side.insp of pta side points

17 Feb 26 - PTA for planning of Interlocking work of gate 34 and gate 15.

18 Feb 26 - DBN for Dual fault check and SI 3 inspection .

19 Feb 26 - Pta for si3 inspection 

20 Feb 26 - KLI for dual fault check and inspection 

21 Feb 26- Leave

22 Feb 26 - CR

23 Feb 26 - Klsx for Indication wiring of IPS ok, UP AT ok, DN AT OK.

24 Feb 26 - KLI FOR 59at fault attended, track 

25 Feb 26 - SDY for engg block

26 Feb 26 - Leave

27 Feb 26 - Rest 

28 Feb 26 - KLI FOR cable shift with telecom 

01 Mar 26 - Pta for si3 inspection of track circuits of DBN side.

02 mar 26 - Pta for joint TRD Inspection 

03 mar 26 - Klsx for inspection 

04 Mar 26 - pta for rolling block preparation 

05 Mar26- kli for Westrace AMC

06 Mar 26- Rest

07 Mar 26- CTW for AMC of statcon and AMC of Delton,Fault check of dual Up side unit no 1 ,NBA side.

08 Mar 26-- pta for si3 inspection 

09 Mar 26- Doc for AMC visit of Statcon 

10 mar 26 - rpj for ips AMC rh2 and drm inspection .

11 Mar 26 - klsx for AMC of Westrace, statcon,Datalogger 

12 mar 26 -Rpj office for joint with pway 

13 to 17 March - leave

18 march - Kli for ips battery charging and point crossing compliance 

19 march - Kli for ips battery charging and point crossing compliance 

20 March- Rest

21 march  - kli for facs validation

22 march- kli for facs validation

23 March - kli for facs validation and si 3 inspection of DOC side yard.

24 March - kli for battery charging, doc for FACS wiring 

Klsx - Emergency point operation pending 

Nabha - 

Emergency Crank Handle- ECHYZ - 25 .09.25

EMERGENCY POINT OPERATION - 25.09.25