Posts

PTA

Point Crossing Inspection  -  West Yard - 20 Point, 25 - Track 30 Dec 25 - Incharge ,All compliance done. PTA Central- Point -120, Track -  30 Dec 25 - Incharge ,All compliance done. PTA East - Point- 20, Track -- 27 31 Dec 25 - Incharge 17 Def pending ( Ballast on track) Failure register-  Summary of failure,Summary of Relay Room , T 351 pending.  Remarks of Sse Incharge pending in failure register.

Staff

  Patiala-  Staff        ---       Rest  Dhananjay MCM - Sunday  Rahul helper - Monday  Janrail ESM -  Bunty ESM - Monday     3 Point main Harichandra Helper - Leave Lakhvindra Helper - Tuesday Rajkumar B/ Smith- Wednesday 

Daily Routine

 31 Jan 26 - Reported at office  01 Feb 26  - PTA 02 Feb 26 - Kli for dual detection up side 03 Feb 26 - PTA Dhablan Quad testing with tele staff 04 Feb 26 - kli for AMC of statcon and westrace EI 05 Feb 26-  Doc for dn distant fault,RPJ Office for official work 06 feb 26 - REST.  07 Feb 26 -- Dhablan for Joint Inspection of Gate 34 INTERLOCKING Work. 08 Feb 26 - Inspection of Point Machines of ESM Janrail at PTA.

DOC

 O5 Feb 25 Attended fault of Dn Double Distant with Jarnail and Banty

KLIl

Kli -  04 line station   04 Feb 25  AMC visit of Statcon and Westrace EI along with ESm Jagarnath without helper RH 1- 55 battery Tobacco company, Total 55 cells, Ips - Statcon.,Back up more than 4 hrs RH 2- 55 Battery,Total 55 cells,IPS -- Statcon, Back up- More than 4 Hours,Two batteries weak.

SIGNAL COMBINED FOR EXAM

Image
  Act means Railway act ,1989. Block Back  - Means to despatch a message from a block station to intimating to block station in rear on a double line, Or Next block station on either side on a single line,that the block section is obstructed or to be obstructed. Shunt Key is the authority for the driver to shunt from Starter upto First Stop Signal of concerned block section.The key authorizes driver to pass Advance Starter at ON during shunting. Block Forward  -  Means to despatch a message from a block station to intimating to block station in advance on a double line,that block in advance is obstructed or to be obstructed. Substitute for Adequate Distance  - 1) Sand hump of approved design 2) Derailing switch under approved Special instructions  Minimum Equipment of fixed Signals In Automatic Block territory on single line- Home and Starter IB Section -  There are three Push buttons in IB panel. PB 1- To reset Axle counter when IB Home passed at ON P...