LAST MINUTE REVISION
IB Section-
There are three Push buttons in IB panel.
PB 1- To reset Axle counter when IB Home passed at ON
PB 2- To reset Axle counter due to failure or improper counting.
PB 3 - To give co operation to the station at rear.
PB 1 and PB 2 can be used only with co operation of station ahead. This co operation is given by pressing PB 3 and indicated by white line near PB1 or PB 2.
There are four Indicators at IB panel.
K1 Indicator-
When a train passes IB at ON,K1 indicator appears and alarm sounds. This indication disappears after normal restoration of circuits by using PB1 and Co operation from Station master.
K2 Indicator-
When train passes LSS and enters Axle counter section, K2 Indicator appears and alarm sounds. This indication disappear when as LSS knob is put back to Normal.
K3 Indicator-
When a train passes IB at OFF, K3 indicator appears and alarm sounds. This indication disappears, IBS knob is normalized.
K4 Indicator-
Appears when power supply of IB signals fails. Disappears after restoration of power supply.
Speed in A route -130 to 160 kmph
Speed in B route - 100 to 130 kmph
230 mm - Dia of Disc of markers.
Movement authority -
Record of critical events need to be stored for 90 days.
Frequency used in TCAS
441.8 MHZ
456.8 MHZ
416.8 MHZ
466.8 MHZ
426.8 MHZ
Station kavach to NMS - E1 Interface
LOCO Kavach to NMS- GSM interface in older versions of kavach.In Kavach 4.0, LTE - R ( 4G for Rail)
Station Kavach - 6 RIU
LS Mode ( Limited Supervision) -
Automatically enters LS mode when valid radio data packets are not received for a specific duration (30 sec in Absolute and 10 second in Automatic)
Communication Range in TCAS is 1.5km normally and in double distant territory, it is 4.5 kms.
RFID Tag Marker-
1. RFID number
2. Type
3. Absolute location
Approx 10 V AC will induce into 100m track circuits
Magnitude and duration of the current in LPZ0A is 100 KVA and 10/350 Micro Second.
Class B - ( Stage 1 Protection)
It can handle 100 KAmp current between Neutral and Earth.
50 KAmp current between all three phases and neutral.
Response time of Class C is less than 25 n seconds
OC should be placed at maximum distance of 15 Kms from CIU.
For EI- System availability (operational Availability of Complete system) shall be 99.98% or better.
FAT-
Performed with computer Simulation
Control table ( including Negative Testing)
Cross table ( Also known as Square sheet testing)-Conflicting movement testing.
SAT -
Logic and interlocking Testing:
1. Control table ( including Negative Testing)
2. Cross table ( Also known as Square sheet testing
Table )
Interface and Equipment function test
1. Intercommunication test between sub racks
2. Correspondence test.
Upto 100 routes - Centralized/ Distributed EI Can be provided with approval of CSTE.
100 to 500 routes -Distributed EI
More than 500 routes - RRI with Metal to Metal or Distributed EI.
TSAA upto 200 routes - PCSTE approval required. TSAA must be prepared as per TAN.
Train/ Four Wheeler/ Bullock Cart/Tonga - 01 unit.
Cycle Rikshaw/Auto Rikshaw - 0.50 unit
Motor cycle - 0.25 unit
Minimum Clearance of Check Rail
At Curve -44 mm
LC gate - 51 mm.
Clearance from bottom of the rail for ground connection rods - 40 mm in RE area.
Point Indicator ( for Non Interlocked points)
1) When point are set for straight line, the indicator shall display a white target by day and white light by night.
2) When point set for diverging line, the indicator shall display the edge of Disc by day and Green light by night.
Trap Indicator-
Shows Red when trap switches are open, Shows Green when they are locked.
Red-60 LED
Yellow- 60 LED
Green- 30 LED
For STD III and STD IV, Double Distant is Mandatory.
On STD II,it is required in section where EBD is more than 1 Km.
Advantages of CTC-
1) Better line Capacity
2) Time table Management
3) Automatic Route Setting
Flexibility is not the advantage of CTC.
Air conditioning may be provided for every Signal interlocking with more than 100 routes.