PTA
Point Crossing Inspection -
West Yard - 20 Point, 25 - Track
30 Dec 25 - Incharge ,All compliance done.
PTA Central-
Point -20, Track -
30 Dec 25 - Incharge ,All compliance done.
PTA East -
Point- 20, Track -- 27
31 Dec 25 - Incharge 17 Def pending ( Ballast on track)
Failure register-
Summary of failure,Summary of Relay Room , T 351 pending.
Remarks of Sse Incharge pending in failure register.
09 Feb - Inspection of PTA East Yard ( Points of Esm Janrail)
Deff -
1) SH 72 - Name plates to be changed
2) Gauge Type Plate Insulation of Pt 113 B,103 A,102 A.
3) Insulation at G/J between 101 ATF and 102 BTR is very thin.
4) Jumper of TC 113 BT to be replaced.
5) Sulfation on ARA Terminal of almost all the Point Machines.
14 Feb 26 -
AMC visit of Statcon IPS for LC gate 19 and Inspection of IPS at Gate 19,Inspection of LC 19 and 20.
Deff - 5 Spare cells of LC 19 are defective.
LC gate 19 is between Up Advanced and Dn Home Signal.
After gate 19,Gate 20 is in Block section.Gate Signals of LC 20 is through IPS at gate 19.
Dn gate Signal of LC 20 - 4 Aspect.
Dn Distant if LC 20 - 3 Aspect.
19 Feb 26 - inspection of Dhablan Side points