Dhablan
Dhablan
4 line Station
Esm Sudesh
Helper - Amit
Crank Handle zone - 12
Point and Crossing Inspection -
East Zone ( PTA side) - Point-13, Track - 21.
Inspection done by Incharge- 24 Jan 26
Compliance pending
West Zone ( NBA side) - Point 11,Track -20
Inspection done by Incharge on 25 Jan 26
Compliance pending.
TRD Inspection- 12 June 25.
Dhablan- PTA UP HASSDAC No 1 on Quad and Number 2 on OFC.
Self Inspection- 11 Feb 26
Points and Tracks and HASSDAC of PTA side.
Deff -
1.GTP insulation of Pt 65 A,64 A,64 B,TP 63, 62 B,61 A to be replaced.
2. Cleaning of ARA terminals inside all Point machines.
3. Cleaning of JB ( L-4) required.
Inspection of Nabha Side yard -
Point 71 a,70a,70b,71b,72,74 Lc 32 carried out.
Deff -
L bracket insulation of p 72 and p74 need replacement.
Fault of L2 SSDAC
If Dn HASSDAC PTA side failed due to train departure,
SSDAC of 03 Birthing line fails due to train arrival,
UP HASSDAC ( pta) side fails due to train.then SSDAC line 2 fails and clears without reset.
TSS is near the Location of SSDAC line 2 and line. Isolation transformer is provided in quad but no effect.
At Reset box flickering of power on LED and occupied Red LED occurs.
Disconnection of UP HASSDAC PTA and DN HASSDAC PTA will be taken simultaneously and 24 v at Location will be checked.
Point crossing inspection
Date - 25 Jan 26
Total deff -23
Total pending - nil
Routes - 73
Load - 25 Amp
Comments