General Rules
Act means Railway act ,1989.
Block Back - Means to despatch a message from a block station to intimating to block station in rear on a double line,
Or
Next block station on either side on a single line,that the block section is obstructed or to be obstructed.
Shunt Key is the authority for the driver to shunt from Starter upto First Stop Signal of concerned block section.The key authorizes driver to pass Advance Starter at ON during shunting.
Block Forward -
Means to despatch a message from a block station to intimating to block station in advance on a double line,that block in advance is obstructed or to be obstructed.
Substitute for Adequate Distance -
1) Sand hump of approved design
2) Deraining switch under approved Special instructions
Minimum Equipment of fixed Signals In Automatic Block territory on single line-
Home and Starter
IB Section-
There are three Push buttons in IB panel.
PB 1- To reset Axle counter when IB Home passed at ON
PB 2- To reset Axle counter due to failure or improper counting.
PB 3 - To give co operation to the station at rear.
PB 1 or PB 2 used only with co operation of station ahead.This co operation is given by pressing PB 3 and indicated by white line near PB1 or PB 2.
There are four Indicators at IB panel.
K1 Indicator-
When a train passes IB at ON,K1 indicator appears and alarm sounds. This indication dissapears after normal restoration of circuits by using PB1 and Co operation from Station master.
K2 Indicator-
When train passes LSS and enters Axle counter section, K2 Indicator appears and alarm sounds.This indication disappear when as LSS knob is put back to Normal.
K3 Indicator-
When a train passes IB at OFF,K3 indicator appears and alarm sounds. This indication dissapears IBS knob is normalized.
K4 Indicator-
Appears when power supply of IB signals fails. Dissapears after restoration of power supply.
Census of LC gates-
Carried out for 07 days by Engg, Signal and Traffic.
Train,Road Vehicle,Bullock Carts and Tonga- 01 unit
Cycle Riksha/Auto Rikshaw- 1/2 unit.
Classification of LC gates-
Special Class- TVU greater 50000
A Class - 30000 to 50000
B Class - 30000 to 20000
B1 Class - 25000 to 30000
B2 Class - 20000 to 25000
C Class - all other LC gates.
Non Interlocking Work -
Working of trains when interlocking between signals and points/ track circuits/slots/slides/block Equipments etc.
Occasions for Non Interlocking working-
a) Overhauling of Lever frames
b) Remodeling of station/gauge conversion/doubling.
c) Introduction of PI/RRI
d) Replacement of worn out frames/panels
e) Cable Meggering
f) S&T/ Engg joints works.
Interlocking -
Four essentials of Interlocking
i) Setting of Routes
ii) Locking
iii) Holding
iv) Prevention of Conflicting movements
Standard of Interlocking-
Standard 1 - Upto 50 kmph
Standard 2- 50 to 110 kmph
Standard 3- 110 to 140 kmph
Standard 4- 140 to 160 kmph
Double distant is required on sections where goods trains have a braking distance more than 1 Km.
2 Months after Commissioning- Stipulated time period as per SEM for taking over the new signalling installation and associated gadgets by Divisional open Line.
20 percent - Spare conductors required in each main cable upto farthest points.
COA Software is used in Divisional Control Office for train control charting.
3.15 m - Thickness of MS Sheet used in manufacturing of Full location box.
Speed in A route -130 to 160 kmph
100 to 130 for Speed in B route.
SWR Revisions- 5 years , 5 corrections
Validity of competency certificate issued by Zonal training school- 4 years.
CSL -686 m
CRS - 715 m.
More than 20 route LEVER - ADSTE
Point testing- Once in month by JE/ SSE
Painting of signal post - 3 years.
Point machine from centre of track - 1600 mm
TLjb-1905 mm
LOCATION -2360 mm
Life of EI ,Axle counter,Ips - 20 yrs.
Kavach - 15 yrs
Track relay,QBCA-10 yrs.
ELB - 10 YRS
Led- 8 yrs.
Quad ,ofc - 25 yrs
No change of gradient within 30 m of point crossing
ABS, IB, DOUBLE DISTANT- GM SANCTION
LC CLOSURE - PCE SANCTION
RE ENERGISATION - EIG ( PCEE)
Catch Siding slip Siding- CRS.
Signaling plan and locking table shall be approved by JAG and above